The Oliver Bridge, which crosses the St. Louis River and connects Minnesota Highway 39 and Wisconsin Highway 105, will close from 8:30 a.m. to 4:30 p.m. Oct. 12-16 for a scheduled inspection.

Outside of that time period all equipment will be removed from the bridge, which will reopen to traffic by 4:30 p.m. each day, according to a news release from the Minnesota Department of Health and CN Railway.

The Oliver Bridge is the smallest of the three bridges crossing the St. Louis River to connect Duluth to Wisconsin.

Newsletter signup for email alerts