ADVERTISEMENT

ADVERTISEMENT

Duluth Shipping News: Indiana Harbor waits for coal in the St. Louis River

Monday, July 20 The Indiana Harbor arrived under the Lift Bridge on Sunday at 5:30 p.m. (pictured). It went through the Duluth harbor, made a half turn by the Blatnik Bridge and backed up the St. Louis River to a position directly behind the Paul R.

569587+indianaharbor20090719_9822.jpg

Monday, July 20

The Indiana Harbor arrived under the Lift Bridge on Sunday at 5:30 p.m. (pictured). It went through the Duluth harbor, made a half turn by the Blatnik Bridge and backed up the St. Louis River to a position directly behind the Paul R. Tregurtha. The Tregurtha was almost finished loading coal at Midwest Energy. Minutes after the Tregurtha departed the dock, the Indiana Harbor was in a position to move right in and start loading coal.

For the latest schedule of arrivals and departures, go to Duluth Shipping News

DULUTH ENTRY

Morning: Presque Isle departing with iron ore pellets; Indiana Harbor departing with coal; John B. Aird arriving to load coal

ADVERTISEMENT

Evening: Beluga Emotion departing with beet pulp pellets; John B. Aird departing with coal

Sometime: Canadian Olympic departing with iron ore pellets

SUPERIOR ENTRY

No traffic expected

TWO HARBORS ENTRY

No traffic expected

What To Read Next
The system crashed earlier this month, grounding flights across the U.S.