The Spruceglen loads coal at Midwest Energy in this aerial photo taken from a vintage 1929 Ford tri-motor airplane. The Spruceglen arrived in port Sunday morning and was to leave late Sunday night.
DULUTH ENTRY
Morning: John G. Munson, arriving to unload limestone and departing late morning or afternoon for Two Harbors; James R. Barker, arriving to load coal and departing in the evening; tug Salvor, arriving; Indiana Harbor, departing with coal; CSL Assiniboine, arriving to load coal; Lee A. Tregurtha, arriving late morning or afternoon to load iron ore pellets
SUPERIOR ENTRY
Morning: Burns Harbor, arriving to load iron ore pellets and departing in the afternoon
ADVERTISEMENT
TWO HARBORS
Morning: Edwin H. Gott, departing with iron ore pellets
Afternoon: John G. Munson, arriving to load iron ore pellets and departing in the evening; Roger Blough, arriving to load iron ore pellets
For updated information 24 hours a day, call the Boatwatcher's Hotline at (218) 722-6489.
Source: The U.S. Army Corps of Engineers Lake Superior Maritime Visitors Center in Canal Park. Arrival and departure times are not official and can vary widely.